1 00:00:04,160 --> 00:00:07,909 t minus 30 seconds 2 00:00:14,230 --> 00:00:08,950 long 3 00:00:14,240 --> 00:00:19,189 20. 4 00:00:24,230 --> 00:00:21,750 15. d minus 15 seconds standing by for 5 00:00:25,750 --> 00:00:24,240 terminal count 6 00:00:26,710 --> 00:00:25,760 t minus 10 7 00:00:27,509 --> 00:00:26,720 9 8 00:00:28,550 --> 00:00:27,519 8 9 00:00:29,509 --> 00:00:28,560 7 10 00:00:31,269 --> 00:00:29,519 6 11 00:00:32,310 --> 00:00:31,279 five four 12 00:00:33,270 --> 00:00:32,320 three 13 00:00:34,310 --> 00:00:33,280 two 14 00:00:37,750 --> 00:00:34,320 one 15 00:00:40,790 --> 00:00:37,760 main engine ignition and liftoff of the 16 00:00:43,510 --> 00:00:40,800 atlas v rocket with lro l cross 17 00:00:53,910 --> 00:00:43,520 america's first step of a lasting return 18 00:01:00,709 --> 00:00:55,590 and we have the pitch program here 19 00:01:04,549 --> 00:01:02,630 rd180 is operating more 20 00:01:09,830 --> 00:01:04,559 speeds are stable 21 00:01:14,070 --> 00:01:11,750 plus battery voltages are stable tank 22 00:01:37,190 --> 00:01:14,080 pressures look good rd180 is continuing 23 00:01:37,200 --> 00:02:06,870 all systems are stable at this point 24 00:02:17,910 --> 00:02:08,630 as we pass through maximum dynamic 25 00:02:21,030 --> 00:02:19,350 and the boosters throttle down right 26 00:02:23,589 --> 00:02:21,040 down schedule engine response looks 27 00:02:26,309 --> 00:02:23,599 typical pump speeds are stable injector 28 00:02:29,270 --> 00:02:26,319 pressures look good 29 00:02:32,710 --> 00:02:29,280 current altitude is 11.3 nautical miles 30 00:02:34,630 --> 00:02:32,720 downrange position is 9.9 miles 31 00:02:43,270 --> 00:02:34,640 velocity is 32 00:02:47,030 --> 00:02:45,030 and we've begun flying the alpha by 33 00:02:49,430 --> 00:02:47,040 stirring phase of flight vehicle body 34 00:02:50,949 --> 00:02:49,440 rates continue to look good 35 00:02:55,910 --> 00:02:50,959 battery voltages are stable tank 36 00:03:05,270 --> 00:02:58,710 booster has enabled closed loop steering 37 00:03:09,509 --> 00:03:06,949 booster engine operation continues to 38 00:03:18,149 --> 00:03:09,519 look very good as we 39 00:03:22,949 --> 00:03:20,309 we've already the rcs pyro valve and 40 00:03:25,270 --> 00:03:22,959 that system has pressurized 41 00:03:33,270 --> 00:03:25,280 according to its normal 42 00:03:41,910 --> 00:03:35,990 and the booster has begun its 180 degree 43 00:03:41,920 --> 00:04:06,789 booster engine continues to operate well 44 00:04:13,110 --> 00:04:08,630 vehicle is still operating well as we 45 00:04:24,629 --> 00:04:14,869 blue space cooldown is underway pump 46 00:04:32,710 --> 00:04:27,430 coming up on our 4.6 g throttle segment 47 00:04:32,720 --> 00:04:39,430 and boost phase cooldown is complete 48 00:04:44,469 --> 00:04:41,749 and we have pico entrance shutdown looks 49 00:04:48,310 --> 00:04:46,790 we have retros and stage separation 50 00:04:50,150 --> 00:04:48,320 looks clean 51 00:04:56,390 --> 00:04:50,160 box and fuel pre-start chain two purge 52 00:05:03,749 --> 00:04:58,550 we have ignition and full thrust on the 53 00:05:07,830 --> 00:05:05,909 we have payload fairing jettison 54 00:05:13,670 --> 00:05:07,840 two good brake wires and good visual 55 00:05:18,310 --> 00:05:15,990 centaur has begun uh closed loop 56 00:05:20,230 --> 00:05:18,320 steering the vehicle baggage look good 57 00:05:22,070 --> 00:05:20,240 centaur pu is being commanded to fixed 58 00:05:31,990 --> 00:05:22,080 angles for the early portion of this 59 00:05:36,629 --> 00:05:34,710 centaur has begun eu limiting 60 00:05:38,230 --> 00:05:36,639 it's operating at the oxidizer rich 61 00:05:46,230 --> 00:05:38,240 condition which is expected for this 62 00:05:49,670 --> 00:05:48,070 rl10 operation looks very good at this 63 00:05:53,830 --> 00:05:49,680 point 64 00:05:55,990 --> 00:05:53,840 continue to run oxidizer rich